Data centres · Trial
Data Centre PUE Lens
See how much energy your data centre spends beyond the IT load, hour by hour and day by day, against your PUE target, in kWh, RWF and CO₂.
Why nowA Rwandan internet provider and a Middle Eastern data-centre developer signed an MoU, reported on 3 June 2026, to co-invest in a new Tier III data centre in Rwanda. DCD, 3 Jun 2026 ↗
- Prepared for
- Prepared by
- Frutos Kamanzi · CEO & Founder, SAANO AI NETWORKS
Drop in meter readings
A CSV of interval readings for the whole facility and the IT load, from your BMS, DCIM or energy meters. It is read in your browser and never leaves this page.
Expected columns (any order, matched loosely): time, facility_kwh (all energy the site drew in the interval) and it_kwh (IT load energy, best metered at the UPS output or closer to the servers), or facility_kw and it_kw with the interval read from the timestamps; optional outdoor_temp_c and cooling_kwh. Method: PUE per ISO/IEC 30134-2 = total facility energy / IT equipment energy. CO₂ uses 0.461 kg per kWh, the grid factor used across this toolkit; enter yours to change it.
Your own file needs a 3-day trial code
The illustrative sample is free. To read your own export, enter the code Frutos sent you. Your file still never leaves this page.
No code yet? Message Frutos on WhatsApp · or call +250 731 000 163
Your 3-day trial has ended
The full version reads your meters every month, tracks PUE against your target for each hall and cooling unit, and ranks the cooling and power-path changes by kWh saved. Let's set it up for your data centre.
Full version: RWF 300,000 a month for your organisation, USD 200 outside Rwanda. Every tool in the kit, unlimited runs on your own data, cancel any month.
Message Frutos on WhatsAppOr call +250 731 000 163