Network migration · Trial
3G Device Census
Turn your list of connected devices (payment terminals, ATMs, meters, trackers, alarms) into 4G readiness, the units that stop working when 3G and then 2G are switched off, and a month-by-month replacement plan.
Why nowOn 28 Jul 2026 the ICT ministry asked every organisation to identify equipment that relies on 2G or 3G, test replacements and confirm service before 3G goes off on 30 June 2027. MINICT, 28 Jul 2026 ↗
- Prepared for
- Prepared by
- Frutos Kamanzi · CEO & Founder, SAANO AI NETWORKS
Drop in your device list
A CSV with one row per connected device, or one row per model with a count. It is read in your browser and never leaves this page.
Expected columns (any order, matched loosely): network (2G, 3G, 4G, LTE-M, NB-IoT), optional type (POS terminal, meter, tracker, alarm), site (branch or district), critical (yes or no), status (none, ordered, installed, tested), last_seen (date) and count. Method: devices that support 4G, LTE-M, NB-IoT or 5G are ready; 3G-at-best devices lose 3G on 30 June 2027; 2G-only devices stop when 2G is retired (working towards December 2028); a replacement counts as done once it is tested.
Your own file needs a 3-day trial code
The illustrative sample is free. To read your own export, enter the code Frutos sent you. Your file still never leaves this page.
No code yet? Message Frutos on WhatsApp · or call +250 731 000 163
Your 3-day trial has ended
The full version reads your whole device register, sets the replacement order and the test protocol for each device class, and keeps the migration plan current for the transition working group until 30 June 2027. Let's set it up for your organisation.
Full version: RWF 300,000 a month for your organisation, USD 200 outside Rwanda. Every tool in the kit, unlimited runs on your own data, cancel any month.
Message Frutos on WhatsAppOr call +250 731 000 163