Trial tools · 2026

Thirty trials. One export each.

Self-serve checks for banks, insurers, government, utilities, operators, contact centres, fleets and transport. Drop in one CSV from your own systems and see, in seconds, where customers, money, water, power or uptime are slipping away.

Prepared by
Frutos Kamanzi · CEO & Founder, SAANO AI NETWORKS
Your data
Read in your browser, never uploaded
Talk to me
WhatsApp · +250 731 000 163
1 · Open

Pick the check that matches the problem you have today.

2 · Run

The sample runs free. Your own CSV opens with a 3-day trial code: ask for one on WhatsApp.

3 · Share

Copy the ready-made summary or save it as a PDF for your team or your supplier.

Full version: RWF 300,000 a month per organisation, USD 200 outside Rwanda. Every tool below, unlimited runs on your own data, cancel any month. Start on WhatsApp

Each card says why it matters now, with its source. Checked 17 Oct 2026.

Payments

Payment Failure Decoder

Why card, ATM and instant transfers fail, whose side each failure is on, and how much money customers tried to move and could not.

BanksMobile moneyFintechsMicrofinance

You need One export of payment attempts with their response codes

Why now On 9 Oct 2026 the central bank said it is tracing delayed eKash transfers with both institutions; failed funds should be returned. KT Press, 9 Oct 2026 ↗

Open the trial

Collections

Collections Reconciler

Every payment received but not recorded, recorded but never received, or booked at the wrong amount, in seconds.

UtilitiesSchoolsInsurersSACCOsRetail

You need Your mobile-money or bank statement and your ledger

Why now eKash now carries 28.9 million transactions a month, up from 1.9 million a year earlier: more payments arriving to match against invoices. KT Press, 9 Oct 2026 ↗

Open the trial

Interconnect & interoperability

Settlement Checker

Your records against your partner’s or the switch’s, day by day and route by route: exactly what is in dispute and what it is worth.

BanksMobile moneyOperatorsAggregators

You need Your daily totals and your partner’s report

Why now eKash now carries 28.9 million transactions a month, and the central bank is resolving transfers that stalled between institutions. KT Press, 9 Oct 2026 ↗

Open the trial

Fraud prevention

SIM-Swap Risk Window

Which SIM swaps, device changes and PIN resets were followed by money leaving the account, how fast, how much and through which channel.

BanksMobile moneyE-money issuersFintechsSACCOs

You need One export of SIM-swap, device, PIN-reset and transfer events

Why now On 18 June 2026, Kenya's High Court upheld an order for an operator and a bank to cover KES 4.4M lost to a SIM swap. tech-ish.com, 13 Jul 2026 ↗

Open the trial

Agent networks

Agent Float Lens

Which agents ran short of e-float, what failed transactions turned away, how long rebalancing took, and where to send float first.

Mobile-money operatorsBanksSACCOsSuper-agentsAggregators

You need One export of agent transactions with the e-float balance after each

Why now By 5 Aug 2026, eKash had processed over 10.5 million transactions worth over FRW 960 billion since its 14 July launch. National Bank of Rwanda, 5 Aug 2026 ↗

Open the trial

Cash channels

ATM Uptime Lens

How much of the month each ATM was out of service, why, when cash runs out, and which ATMs miss the target.

BanksSACCOsCredit societiesATM deployers

You need An ATM out-of-service log with start, end and reason

Why now Since 14 July 2026, eKash links every bank and e-money issuer for transfers and merchant payments. TechAfrica News, 13 Jul 2026 ↗

Open the trial

Credit

Portfolio at Risk Lens

How much of the loan book is past due (PAR30, PAR90), and which branches, officers and products carry the money at risk.

SACCOsMicrofinanceSME lendingAgriculture lending

You need One export of active loans with days past due

Why now New lending to agriculture rose 177% in the first half of 2026, to RWF 57 billion, central bank figures show. KT Press, 27 Aug 2026 ↗

Open the trial

Billing & collections

Billing Collection Lens

How much of what you billed has been collected, how much was paid on time, how old the arrears are and who to chase first.

SchoolsSchool-fee platformsUtilitiesLandlordsMember organisations

You need One export of bills with amounts billed and paid, and their dates

Why now The 2026/27 school year opened on 7 September 2026; its first term closes on 17 December. The New Times via allAfrica, 29 Jul 2026 ↗

Open the trial

Insurance claims

Claims Red-Flag Scanner

Which claims carry red flags (early, late, duplicate, repeat, outlier provider), what they are worth and which provider to audit first.

General insurersMedical schemesBrokersClaims administrators

You need One claims export with policy start, loss and report dates

Why now Rwanda's insurers' association said on 12 Oct 2026 a claim should be settled within five days of complete documents. The New Times, 12 Oct 2026 ↗

Open the trial

Insurance pricing

Motor Loss Ratio Lens

Loss ratio, frequency and average claim by vehicle type, use and age, and the premium change each segment needs.

Motor insurersBrokersBancassurance teamsReinsurers

You need One export of motor policies with earned premium and incurred claims

Why now Insurers say motor third-party premiums could rise 20-30%: repair costs doubled while tariffs stood still. The New Times, 12 Oct 2026 ↗

Open the trial

Service delivery

Turnaround & Backlog Lens

How long claims, applications, complaints or tickets take to close, how many break your target, and how old the open backlog is.

BanksInsurersGovernmentUtilities

You need A case log with opened and closed dates

Why now BNR allows 15 days to resolve a complaint and one working day to acknowledge it; the third-quarter report is due on 20 October 2026. BNR, Regulation No. 56/2022 ↗

Open the trial

Customer service

Contact Centre Staffing Lens

How many agents you need each hour to answer on time, where your schedule leaves customers waiting, and where it pays for idle seats.

BanksOperatorsUtilitiesInsurersAirlines

You need Calls per hour or half hour, with your schedule if you have it

Why now 3G switches off on 30 June 2027, with pilot shutdowns in 2026: every customer who needs a new phone or SIM must be reached. KT Press, 28 Jul 2026 ↗

Open the trial

Customer messaging

OTP & SMS Delivery Lens

How many one-time passwords and alerts reach the phone in time, network by network, and what the late ones cost.

BanksFintechsE-governmentAirlines

You need One export of SMS delivery receipts

Why now In April 2026 a national e-government portal reported login OTPs and SMS notifications failing to arrive. Portal status page, 11 Apr 2026 ↗

Open the trial

Digital channels

API & App Health Lens

How often your app, website or API fails customers, which endpoints are slow, and how fast errors are eating your uptime target.

BanksFintechsE-governmentE-commerce

You need A day or a week of API or web-server logs

Why now From 2 to 8 July 2026 a national e-government portal reported unstable applications for every service that needs National ID data. Portal status page, Jul 2026 ↗

Open the trial

Channel assurance

Channel Journey X-ray

Exactly where customers fall out of your USSD or app journey, by step, network and hour, and what it is costing you.

BanksMobile moneyUtilitiesInsurers

You need One day of USSD or app session records

Why now Since RURA’s January 2026 directive, every USSD short code must work the same way on all networks. KT Press, Jan 2026 ↗

Open the trial

Interconnect assurance

SIM-Box Finder

Which international routes arrive showing a local number, which SIMs to bar on your network and which to report on others.

Mobile operatorsFraud teamsRevenue assuranceInterconnect

You need Voice calling records, test-call results, or both

Why now On 13 Feb 2026 the ITU-T approved E.371: SIM boxes, call masking and refiling named as impermissible traffic. ITU-T E.371, Feb 2026 ↗

Open the trial

Interconnect assurance

International Bypass Lens

Which international routes arrive showing a local number, which SIMs relay those calls and where, and what it costs.

OperatorsRegulatorInterconnect carriersRevenue assurance

You need Voice calling records, test-call results, or both

Why now On 21 Aug 2026 Congo’s regulator dismantled its sixth SIM-box network of 2026: 422,000+ minutes rerouted. TechAfrica News, 28 Aug 2026 ↗

Open the trial

Network assurance

Signalling Cause Decoder

A day of call and session failures ranked by cause, decoded to the standard, with the first place to look for each.

OperatorsISPsVoice carriersContact-centre platforms

You need Failure cause codes from your switch, core or logs

Why now 3G switches off on 30 June 2027: voice moves to 4G and IMS, so call-failure causes need watching through the migration. MINICT announcement ↗

Open the trial

Network migration

3G Switch-off Readiness

What share of subscribers keep calls and data when 3G goes, which areas hold the devices at risk, and if the pace beats the date.

OperatorsRegulatorBanks (POS)Utilities (meters)Fleet tracking

You need Weekly device-capability counts per district or cell

Why now 3G switches off nationwide on 30 June 2027, with pilot shutdowns in 2026; 2G is retired later. KT Press, 28 Jul 2026 ↗

Open the trial

Network migration

3G Device Census

Which of your connected devices stop working when 3G and then 2G go, which sites and device types to replace first, and the month-by-month plan.

GovernmentBanks (POS, ATMs)Utilities (meters)HealthFleet tracking

You need One list of connected devices with their network

Why now The ICT ministry asks every organisation to list equipment that relies on 2G or 3G and test replacements before 3G goes off on 30 June 2027. MINICT, 28 Jul 2026 ↗

Open the trial

Network migration

SIM Onboarding Decoder

What each SMS after a SIM swap did and what the entitlement server told the phone, decoded to the standard, with the step that leaves VoLTE or Wi-Fi calling off.

OperatorsMVNOseSIM and entitlement teams

You need SMS PDUs from the SMSC, OTA platform or a phone log, plus entitlement answers if you have them

Why now Operators spend the rest of 2026 improving VoLTE reliability and finding the devices that still depend on 2G and 3G, before 3G goes off on 30 June 2027. The New Times, 2 Aug 2026 ↗

Open the trial

Regulatory compliance

QoS Return Check

Whether this month's quality-of-service return passes the regulator's thresholds for the nation, the City of Kigali and each district, the francs at stake and the filing date.

OperatorsRegulator

You need The monthly KPI export, one row per area

Why now RURA's Regulation 21/2026 prices each failed quality KPI at FRW 5,000,000, with the return due five working days after month end. RURA, 12 Aug 2026 ↗

Open the trial

Connectivity

Link SLA Auditor

Which internet and WAN links broke their SLA, which provider is responsible, and the service you paid for and did not get.

BanksGovernmentHospitalsHotelsRetail chains

You need One month of link outages from monitoring or tickets

Why now In April 2026 RURA ordered an internet provider to compensate customers for a week of disruption and pay daily penalties until compliant. Ecofin, 29 Apr 2026 ↗

Open the trial

Power supply

Power Reliability Index

An outage log turned into the standard indices: how often supply fails, for how long, and which feeders or sites cause most of it.

UtilitiesMini-gridsTower companiesIndustrial parks

You need One month of outage records

Why now On 10 September 2026 senators raised frequent power interruptions reported by schools and health facilities. The New Times, 10 Sep 2026 ↗

Open the trial

Site power

Backup Autonomy Lens

Which sites go dark before the grid returns, how long backup really lasts, and where generators fail to start.

Tower companiesMobile operatorsData centresBanks with branch and ATM sitesHospitals

You need One alarm log with mains fail, site down and generator alarms

Why now On 10 Sep 2026 senators raised frequent power interruptions with the national utility. The New Times, 10 Sep 2026 ↗

Open the trial

Site energy

Site Energy Baseline

One month of fuel and grid records turned into a measured baseline in litres, kWh and tonnes of CO₂, with fuel-loss sites flagged by name.

Tower companiesOperatorsData centresBranch networks

You need One month of site fuel and grid records

Why now RURA’s 6 June 2026 review capped diesel at RWF 2,927 a litre, 33% above the early-April cap. ynews.digital, 7 Jun 2026 ↗

Open the trial

Data centres

Data Centre PUE Lens

How much energy your data centre spends beyond the IT load, by hour, day and outdoor temperature, in kWh, RWF and CO₂.

Data centresCloud and hostingBanksGovernmentUniversities

You need Interval meter readings for the facility and the IT load

Why now An MoU reported on 3 June 2026 plans a new Tier III data centre in Rwanda, co-funded by a Rwandan internet provider. DCD, 3 Jun 2026 ↗

Open the trial

Revenue protection

Meter Loss Finder

Which meters read far below their own history or their class, which are zero, stuck or estimated, and the units a month at risk.

Electricity utilitiesWater utilitiesPrivate water operatorsIndustrial parks

You need Monthly reads or consumption per meter

Why now In April 2026 the regulator put non-revenue water, illegal connections and billing gaps included, at about 35%. Umunota, 24 Apr 2026 ↗

Open the trial

Water networks

Water Loss Balance

How much water each zone never bills, the losses per connection a day, and which zones are getting worse.

Water utilitiesPrivate water operatorsIndustrial parksCampuses

You need Monthly system input and billed volumes per zone

Why now In the year to June 2025, 37.8% of the water the national utility produced earned no revenue. KT Press, 26 Jun 2026 ↗

Open the trial

Fleet

Fleet Fuel Leak Finder

Which vehicles burn more fuel than their type explains, which fill-ups cannot be right, and what the excess costs at today’s pump price.

LogisticsBus operatorsUtilitiesGovernment fleets

You need Fill-up records with odometer readings

Why now RURA’s 6 June 2026 review capped diesel at RWF 2,927 a litre, 33% above the early-April cap. ynews.digital, 7 Jun 2026 ↗

Open the trial

Public transport

Bus On-Time & Headway Lens

On-time departures, excess wait time and bunching per route, and the hours of the day to fix first.

Bus operatorsCity transport authoritiesTransport cooperativesFleet managers

You need One export of scheduled and actual departures

Why now Kigali's weekday bus riders rose to nearly 230,000 after bus lanes opened in late April 2026. The New Times, 22 May 2026 ↗

Open the trial

Want it on your live data?

The full version runs on your own exports every day and sends your team only the exceptions, with the fix and the check that proves it.

Sample runs use anonymous sample data (Network A, Zone K, Route 108, masked payers), not anyone's real records. Your own files open with a 3-day trial code and are read in your browser only. Full version: RWF 300,000 a month per organisation (USD 200 outside Rwanda), every tool, cancel any month. © 2026 Frutos · Kigali